NIBULON’s partners, such as Kondratiuk V.C. individual entrepreneur, Astarta Mlynelevatorbud Ltd, METTRANSSERVICE Ltd., have successfully installed foundations for the new facilities and mounted metalware for silos and transitional galleries.
Specialists from Grain Capital-Engineering LTD. have already assembled the first silo to store grain. They will soon assemble the second and third ones.
The contractors installed active ventilation grain systems to ventilate intergrain spaces and to enrich with oxygen, preserving grain vitality.
The specialists have mounted chain conveying equipment on the upper loading galleries. They will soon finish installing belt conveyers on the lower unloading galleries.
The contactors are laying electric networks and installing low current systems.
The workers are improving the territories.
All NIBULON’s contractors and specialists demonstrate great team work at the site, without slowing down the pace. The specialists will soon test the equipment installed.
Once NIBULON puts additional silos into operation, the total storage capacity will comprise about 98 thousand tons at Voznesenska branch, and the annual transshipment volume will be more than 600 thousand tons.
We would like to remind you that NIBULON has recently put its new facility to receive, store, and to ship agricultural commodities in Khmilnyk (Vinnytsia region) into operation. Its total grain storage capacity is 4 thousand tons.