At present they have assembled bottom subsections of the units No.2-5 as well as subsections of the unit No.1. The specialists assemble them on berth. The shipbuilders are forming the aft half-hull of the order No.10007.
Meanwhile, the specialists are assembling subsections of the unit No.6 (order No.10007) and units No. 10, 12 (order No. 10008). The specialists of the assembly and welding workshop are producing assemblies for subsections. The side subsections are being produced for the units of parallel middle body.
Pallada State Plant (Kherson) supplies parts to construct three non-self-propelled barges (orders No.10007, No.10008, No.10009). At present NIBULON shipbuilding and repair yard has received 85% of the parts planned.
The construction of non-self-propelled vessels (NBL-91 project) at NIBULON shipbuilding and repair yard is an important component to develop NIBULON’s cargo fleet. The program provides for the construction of 12 such vessels with the draught of 2.7 m to transport cargoes along the Southern Bug and other shallow rivers. The vessel’s displacement comprises 3,750 tons. The vessels will be accompanied by the tugs (121 project) being built at NIBULON shipbuilding and repair yard.