This week the contractors start installing heating, ventilation, sewage, electric power systems, etc. in the finished buildings, namely in the administrative and laboratory building, cafeteria and partly in mechanical workshops. In addition, a contractor for the installation of water pipes and wells has been defined. This work will be carried out by Burvod (Mykolaiv).A well-known Ukrainian company Bulat has already started mounting platforms of truck scales. Bulat is a long-term partner of NIBULON which has installed scales at many branches. The manufacturer of equipment for the weighing station, which will have been delivered to the construction site by the end of the month, is a French company PRECIA S.A. NIBULON has signed contracts with such suppliers of modern equipment as AGI (Canada, metal silos), Cimbria Unigrain A/S (Denmark, conveying equipment), BUHLER GmbH (Switzerland, grain cleaning equipment), Mathews Company (the USA, dryers), Morillon (France, screws), UAB Liucija (Lithuania, cyclone filters and fans), Kalynivskyi Machine Building plant (Ukraine, truck tippers) and others to equip its transshipment terminal.Meanwhile, specialists from Construction Company Ltd. (Dnipro) finish mounting metalware of the headhouse. Thus, the specialists will start plating it with metal soon. TSKS Ltd. will start mounting metalware of the truck tipper.At the same time, specialists from Ukrdobrobud continue concreting the berth and covering it up to 3 m. About 1,500 builders from 70 contracting organizations from almost all regions of Ukraine will be involved in constructing the facility. Putting of the terminal into operation will enable the company not only to create about 120 jobs, including jobs for local people, but also contribute more than UAH 5 million in taxes annually to the local budget.