Status of St.Mykolai Floating Crane Construction as of March 26, 2013

There is a photo report about status of St.Mykolai floating crane construction of NB 603 manufacturing order.
***
Fabrication.
As of March 26 Romanian shipbuilders completed assembly and welding works on all sections of St.Mykolai floating crane.
They are being painted now.
This week SNC shipyard is going to place all sections of pressure-resistant hull in dry dock.
Painting.
Shipbuilders have cleaned and painted sections: starboard section No30, port section No30, central section No30 and port section No40.
Hull formation in dry dock.
Welding of erection joint between starboard sections No10 and No20 has been completed.
Port section No30, central section No30, starboard section No30 and port section No40 were placed in dry dock. They are being assembled to unit No20 and between each other.
On the shipyard working area there is being performed assembly of unit No90 (navigation house) with units No60 and No80 (superstructure).
Mast was installed on a navigation house top.
***
We would remind you that on December 6 with participation of NIBULON’s General Director Oleksiy Vadaturskyy and SNC President George Bosinceanu there was held a solemn ceremony of keel-laying of the vessel.
St.Mykolai floating crane is intended for loading/unloading operations in grab mode with lifting capacity of up to 45 tons and in hook mode – up to 60 tons on inland waterways, in the Azov Sea and in the Black Sea costal area of up to 20 miles the whole year round.
Technical characteristics ensure to carry out loading/unloading operations with wave height of up to 1.5m and wind velocity – up to 20m/s.
Its mains dimensions: length overall – 52.3 m; breadth – 22 m; draught (lightship) – 2 m; displacement (at 2 m draught) – about 2000 tons; speed – not less than 4 knots. The floating crane lifting capacity: in grab mode (boom reach – 32 m) – 45 tons, in hook mode (boom reach – 26 m) – 60 tons.

Keep up with the latest news!

You will receive our news in a weekly digest format

[pwf_filter id="8699"]

Оформити заявку

Become a supplier

BECOME A LANDHOLDER

Order a service

Best Employer of the Year in the Socially Responsible Employer nomination
Issued by

All-Ukrainian Public Organization “Taxpayers Association of Ukraine”

Certifications

ISO 14001:2015

Year

2017, 2019

Андрій Вадатурський

CEO

Андрій Вадатурський став генеральним директором «НІБУЛОНу» після понад 15 років роботи в компанії — в липні 2022 року.

Він прийняв цю посаду після трагічної загибелі свого батька та засновника «НІБУЛОНу» Олексія Вадатурського разом із матір’ю Раїсою Вадатурською під час російського ракетного удару по їхньому дому в Миколаєві.

З 2014 до 2019 рік був народним депутатом України від одномандатного округу в Миколаївській області та членом Комітету з питань аграрної політики. У 2017 році створив і очолив велику міжпартійну групу, яка виступала за розвиток українських річок як транспортного засобу.  

Має ступінь магістра електротехніки Українського державного морського технічного університету та ступінь магістра економіки промисловості Лондонської школи економіки. У 2009 році за вагомий внесок у розвиток агропромислового комплексу України був нагороджений Президентом України, йому присвоєно звання «Заслужений працівник сільського господарства».

Одружений, має трьох дітей.

Send resume